Today: Last Update:

 
 
 
 
 
 
 
 
 
  • 2018 Leader Expected Soon; Future Unclear for Montreal Olympic Stadium


    09/15/11

    The ATR Olympic Newsdesk
    Is Proudly Sponsored By

    Gangwon Province

    2018 Chief Decision Soon

    South Korean president Myung Bak Lee will make a decision shortly on who will lead the PyeongChang 2018 organizing committee.
    Bid leader Yang Ho Cho is reportedly among the candidates to head PyeongChang 2018's organizing committee. (ATR)

    According to The Korea Herald, a source within the sports ministry tells the daily: “I believe he’ll make the decision no later than next week.”

    Lee is reportedly considering Yang Ho Cho, who led the bid; Y.S. Park, chair of the Korean Olympic Committee and Jin Sun Kim, former governor of Gangwon Province and the leader of PyeongChang’s two other bids.

    The source claims “there are several others on Lee’s list” but did not say who.

    “Lee is still examining several options, but it won’t take long."

    On Oct. 6, the bid committee will be dissolved, forming the organizing committee shortly after.
     
    Uncertain Future for Notorious Stadium

    Montreal’s Olympic Stadium is largely unused after the Expos moved to Washington D.C. in 2004 and became the Nationals. (Getty Images)
    Montreal’s 1976 Olympic Stadium could be demolished.

    The venue is most notorious for cost overruns and its current white elephant status. The final tab came to nearly $1.5 billion and was paid off 30 years after the Games.

    However, the government agency that oversees the stadium’s administration will start public hearings about its future next week.

    A report in the Canadian Press quotes committee head Lise Bissonnette as saying that demolishing the venue is a potential course of action.

    "The way the stadium is built you cannot demolish it by just putting some dynamite in it and getting rid of it in a day. It would take months," she said Wednesday.

    Demolition has been discussed before. However, due to the all-concrete nature of the stadium, estimates to tear down the building are extremely high.

    Bissonnette said the money would be better spent on renovations to relaunch the stadium and the surrounding Olympic Park facilities, which include museums, a sports center and a 165-meter inclined tower.

    "Though the stadium had its problems, as a piece of architecture it's absolutely famous and beautiful," she said.

    "To demolish that would be, I think, a sort of failure that we would not recover from symbolically."

    A report on the stadium’s future is expected next year.

    British, Russian PMs Cite Olympic Connection

    In Monday’s meeting with his Russian counterpart, British prime minister David Cameron cited the Olympics as a common link with Russia.
     
    Vladimir Putin (center-left) told David Cameron (center-right) he hopes to continue Russia’s strong relationship with Great Britain. (Russian Prime Minster Office)
    According to a transcript released by Vladimir Putin’s office, Cameron said: "Obviously there are many things on the economic front that we can discuss, such as the World Trade Organization, the cooperation I think we can have on the issue of the Olympics – both our Olympics next year and the Sochi Winter Olympics.”

    Cameron made the comments during a state visit to Russia.

    Prime Minister Putin stressed his desire to continue the positive relationship with Great Britain, Russia’s largest trading partner.

    Written by Ed Hula III.

    For general comments or questions, click here.

    Your best source of news about the Olympics is www.aroundtherings.com, for subscribers only.